invitation to tender
whole doc.
date:
tender no.
1. the people''s republic of china has-applied for a loan and creditfrom the world bank towards the cost of ________________ project. it isintended that part of the proceeds of this loan and credit will be appliedto eligiblepayment under various contracts for ____________ , __________,__________. tendering is open to all tenderers from eligible sourcecountries as definedunder the "guidelines for procurement" of the worldbank.
2. ________ __ company now invites sealed tenders from pre-qualifiedtenderers for provision of the necessary labour, materials, equipment andservices for the construction and completion of the project.
3. pre-qualified tenderers may obtain further information from, andinspect the tender documents at the office of: ________.
4. a complete set of tender documents may be obtained by anypre-qualified tenderer for the cost of rmb _________ or us $ ___________on the submission of a written application to the above.
5. all tenders must be accompanied by a tender security in anacceptable form and must be delivered to ________ comp ny at theabove-mentioned address (refer to item 3) on or before ___________.
6. tenders will be opened in the presence of those tenderers''representatives who choose to attend at ____________ (time).
7. if a prequalified foreign tenderer wishes to form joint venturewith a domestic contractor, such a request will be considered if receivedwithin ______ days before the closing date for submission of tenders. theselected local contractor shall be subject to approval by the employer.
8. the pre-tender meeting will be held on __________ at the followingaddress: _________.&nb sp;
instructions to tenderers
general1. description of works (sketch)
all tenderers shall have equal access for supply of domestic labourandmaterial.
the contractor shall make his own arrangements for the procurement oflocal labour, materials, transportation and other services.
the employer will assist contractor in locating potential number ofsuppliers for local labour, materials. the employer will also assist thecontractor in making his own arrangement for supply of fuel andexplosives.2. source& nbsp;of funds
2.1 the people''s republic of china has applied for a loan and creditfro
[1] [2] [3] [4] [5] [6] [7] [8] 下一页