由黑河工程谈基岩面开挖要点           
由黑河工程谈基岩面开挖要点
【摘  要】本文试图通过对多年在黑河项目施工过程中岩基开挖产生不到位的现状的原因进行分析总结,着重讨论水工建筑物基岩面开挖要点以及岩基开挖不到位因素,并提出如何预防开挖不到位;它涉及范围广领域面宽,要提高基岩面开挖施工质量,不但要提高施工人员素质,而且还要进行科学合理试验选取爆破技术参数,以便达到费用低效果高的追求目标,目的在于互相交流、借鉴和提高。
【关键词】基岩;开挖;不到位;预防;黑河水利枢纽工程
【Abstract】The article attempts to project through years in Heihe River batholith construction process, resulting not in place the status of excavation analysis of the reasons summarized, focusing Discuss excavation of bedrock surface elements of hydraulic structures, as well as rock excavation are not in place-based factors, and to propose how to prevent the excavation is not in place; it involves a wide range of areas lacking a broad prospect, to improve quality of construction excavation of bedrock surface, not only to improve quality of construction workers, but also to conduct a scientific and rational blasting technique selected test parameters, in order to achieve low-cost effects of a high goal to pursue aim of mutual exchange, learn and improve.
【Key words】Base rock; Excavation; Lacking; Prevention; Heihe river water control projec
        从1992年起,我就进入西安市黑河引水渠道及黑河水利枢纽工程施工中,在黑河工程建设过程中,经常遇到岩石基础面开挖,如低坝自流引水枢纽及引水洞开挖、蔺家沟拦碴坝坝基开挖、坝下游截渗墙基础、护岸齿槽基础以及电站厂房基础等建筑物基岩面开挖。在岩石基础面开挖过程中,开挖不到位也就是超欠挖现象十分普遍。如何将岩基开挖不到位控制在规范和设计允许偏差之内是一个复杂的技术问题,也就是本文要讨论的水工建筑物基岩面开挖要点,它涉及范围包括岩石的结构和特性,爆破施工工艺和方法,施工机械及爆破器材等领域。经过十多年施工探索和总结,现就岩石基础面爆破开挖提出自己的一点拙见,以便互相交流、借鉴和提高。
        1. 岩基开挖状况
        1.1  规范规定的标准。
        水利部颁发的行业标准《水工建筑物岩石基础开挖工程施工技术规范SL47-94》及水电部颁布的《水工建筑物地下开挖工程施工技术规范SDJ212-83》是目前行业开挖工程执行的现行标准,其中分别对开挖施工做了如下规定:对节理裂隙不发育、较发育、发育和坚硬、中等坚硬的岩体:
        (1)水平建基面高程的开挖偏差,不应大于20cm;
        (2)设计边坡轮廓面在一次钻孔深度条件下开挖时,不应大于其开挖高度的±2%;在分台阶开挖时,其最下部一个台阶坡脚位置的偏差以及整个边坡的平均坡度,均应符合设计要求。
        对节理裂隙极发育和软弱岩体,不良地质地段的岩体,坑槽和有特殊要求的部位;以